Stanwell Power Station

A complex DAS installation at Stanwell Power Station, ensuring reliable site-wide communications after the 3G network shutdown.

Date
Sep 2025
Location
Rockhampton, QLD
Service
DAS Installs

Stanwell Power Station is one of Queensland’s major power generation sites, requiring robust communications in a high-risk, 24/7 operating environment. Following the shutdown of the 3G network, CT Projects delivered a new 3-sector hybrid DAS to ensure continuous site-wide coverage.

  • Installed in a live, high-risk power station environment
  • 3-sector hybrid DAS designed for reliability and redundancy
  • Delivered to meet strict safety and compliance requirements
  • Ensured seamless communications across critical operations

This project highlights our ability to deliver essential infrastructure solutions in demanding and hazardous environments where reliable connectivity is non-negotiable.

Our work at Stanwell Power Station showcases the design and installation of a hybrid DAS in a critical infrastructure setting, ensuring communications remain reliable across the entire site.

No items found.

Talk to our team today

Have a project in mind? Our team is ready to provide advice and solutions tailored to your needs.

Follow me on

Thank you

Thanks for reaching out. We will get back to you soon.
Oops! Something went wrong while submitting the form.